IHI.org - A resource from the Institute for Healthcare Improvement
Header Image






How to Improve

Improvement Methods

The Model for Improvement,* developed by Associates in Process Improvement, is a simple yet powerful tool for accelerating improvement. The model is not meant to replace change models that organizations may already be using, but rather to accelerate improvement. This model has been used very successfully by hundreds of health care organizations in many countries to improve many different health care processes and outcomes.

The model has two parts:
  • Three fundamental questions, which can be addressed in any order.
  • The Plan-Do-Study-Act (PDSA) cycle** to test and implement changes in real work settings. The PDSA cycle guides the test of a change to determine if the change is an improvement.

Including the right people on a process improvement team is critical to a successful improvement effort. Teams vary in size and composition. Each organization builds teams to suit its own needs.
Forming the Team



Model for Improvement 
Setting Aims
Improvement requires setting aims. The aim should be time-specific and measurable; it should also define the specific population of patients that will be affected.
Establishing Measures
Teams use quantitative measures to determine if a specific change actually leads to an improvement.
Selecting Changes
All improvement requires making changes, but not all changes result in improvement. Organizations therefore must identify the changes that are most likely to result in improvement.
Testing Changes
The Plan-Do-Study-Act (PDSA) cycle is shorthand for testing a change in the real work setting — by planning it, trying it, observing the results, and acting on what is learned. This is the scientific method used for action-oriented learning.
 


Implementing Changes
After testing a change on a small scale, learning from each test, and refining the change through several PDSA cycles, the team can implement the change on a broader scale — for example, for an entire pilot population or on an entire unit.

Spreading Changes
After successful implementation of a change or package of changes for a pilot population or an entire unit, the team can spread the changes to other parts of the organization or in other organizations.

 

Sources:

*Langley GL, Nolan KM, Nolan TW, Norman CL, Provost LP. The Improvement Guide: A Practical Approach to Enhancing Organizational Performance.

**The Plan-Do-Study-Act (PDSA) cycle was originally developed by Walter A. Shewhart as the Plan-Do-Check-Act (PDCA) cycle. W. Edwards Deming modified Shewhart's cycle to PDSA, replacing "Check" with "Study." [See Deming WE. The New Economics for Industry, Government, and Education. Cambridge, MA: The MIT Press; 2000.]


What Works

On Demand:
An Introduction to the Model for Improvement

 

This free On Demand presentation features Robert Lloyd, PhD, who provides a comprehensive introduction to the Model for Improvement — a simple, yet powerful tool for bringing about rapid, significant improvements in care.


Don't Miss This

Workspace on IHI.org